AHWG-20090303: Difference between revisions
Jump to navigation
Jump to search
(New page: ==Present== ? ==Time== ~? min. ==Agenda== * Discuss testing timeline for AmiGO 1.6 * Things to test: ** GONuts integration *** Term page *** GONuts back to AmiGO ** Installation scrip...) |
No edit summary |
||
(3 intermediate revisions by the same user not shown) | |||
Line 1: | Line 1: | ||
==Present== | ==Present== | ||
Pascale, Seth, Chris, Mary, Edith, Jane | |||
==Time== | ==Time== | ||
~ | ~15 min. | ||
==Agenda== | ==Agenda== | ||
* Discuss testing timeline for AmiGO 1.6 | * Discuss testing timeline for AmiGO 1.6 | ||
* See: http://wiki.geneontology.org/index.php/Web_Presence_Working_Group:_Testing_Guide | |||
* Things to test: | * Things to test: | ||
** GONuts integration | ** GONuts integration | ||
Line 30: | Line 31: | ||
==Discussion== | ==Discussion== | ||
* | * Chris wonders why there is a week heads-up for testing | ||
** Seth pleads self-defense | |||
** Will let testing start early for eager beavers | |||
==Action Items== | ==Action Items== | ||
* . | * send note to WPWG to start testing | ||
** when things quiet down, open to ref, then larger group | |||
* track down chris's mysql bug (fixed on beta, will work in dev?) | |||
* bump hs summary to other software [actually, seth now thinks that this is by design to hide the page] | |||
* change wiki links to be goweb-dev instead of ash (done) | |||
* Bring up 1.7 in more detail in two weeks | |||
==Previous and Ongoing Action Items== | ==Previous and Ongoing Action Items== |
Latest revision as of 18:31, 3 March 2009
Present
Pascale, Seth, Chris, Mary, Edith, Jane
Time
~15 min.
Agenda
- Discuss testing timeline for AmiGO 1.6
- See: http://wiki.geneontology.org/index.php/Web_Presence_Working_Group:_Testing_Guide
- Things to test:
- GONuts integration
- Term page
- GONuts back to AmiGO
- Installation scripts (install.pl, refresh.pl, version.pl)
- Homolset
- Summary page
- Graphs
- Dynamic
- Static
- Highlights
- GP search
- GP details
- Beta links (if wanted)
- Beta button
- Beta layout
- OpenSearch widget
- GONuts integration
Discussion
- Chris wonders why there is a week heads-up for testing
- Seth pleads self-defense
- Will let testing start early for eager beavers
Action Items
- send note to WPWG to start testing
- when things quiet down, open to ref, then larger group
- track down chris's mysql bug (fixed on beta, will work in dev?)
- bump hs summary to other software [actually, seth now thinks that this is by design to hide the page]
- change wiki links to be goweb-dev instead of ash (done)
- Bring up 1.7 in more detail in two weeks
Previous and Ongoing Action Items
- web converter for old-format obo files (part of general purpose converter).
- jane to get ...?
- action item (chris) to remind ev code group
- release SOP wishlist (seth)
- then ask ben
- indentured testing
- name to feature mapping
- a week's heads up
- discuss SOP when we have more people
- send notes along to software group
- amigo data structs (amelia)
- ref gen and DBIx::Class (seth)
- put all new stuff in next release tracker (seth)
- clean tracker more