Manager 3Nov10: Difference between revisions

From GO Wiki
Jump to navigation Jump to search
No edit summary
mNo edit summary
Line 1: Line 1:
==Agenda==
==Agenda==


* AmiGO testing (Rama)
=== AmiGO testing ===
(Rama)
AmiGO version 1.8 went out for testing 2 weeks back and not many GOC curators came forward to test (some of you may have noticed that Val tested the interface a lot). It is disappointing. And it is not like there is a new feature in AmiGO every week. Here is a breakdown of the groups being supported by the GOC. Can we expect some % of time from each of these groups to test?
AmiGO version 1.8 went out for testing 2 weeks back and not many GOC curators came forward to test (some of you may have noticed that Val tested the interface a lot). It is disappointing. And it is not like there is a new feature in AmiGO every week. Here is a breakdown of the groups being supported by the GOC. Can we expect some % of time from each of these groups to test?


Line 12: Line 13:
* Dictybase/Northwestern  
* Dictybase/Northwestern  
* RGD/Medical College of Wisconsin
* RGD/Medical College of Wisconsin




==Reference Genome==
==Reference Genome==
* PAINT curation ramp up/testing of curation rates: with Mike L, Rama, Li
* PAINT curation ramp up/testing of curation rates: curators: Mike L, Rama, Li?
* Plan:
** PAINT bug fixes, curator training (Nov)
** 10 days in December from each curator

Revision as of 14:09, 2 November 2010

Agenda

AmiGO testing

(Rama) AmiGO version 1.8 went out for testing 2 weeks back and not many GOC curators came forward to test (some of you may have noticed that Val tested the interface a lot). It is disappointing. And it is not like there is a new feature in AmiGO every week. Here is a breakdown of the groups being supported by the GOC. Can we expect some % of time from each of these groups to test?

  • EBI - GO-Office
  • SGD/Stanford
  • MGI/ Jackson Laboratory
  • EBI - GOA
  • WormBase/CalTech
  • TAIR/ Carnegie
  • Dictybase/Northwestern
  • RGD/Medical College of Wisconsin


Reference Genome

  • PAINT curation ramp up/testing of curation rates: curators: Mike L, Rama, Li?
  • Plan:
    • PAINT bug fixes, curator training (Nov)
    • 10 days in December from each curator