Manager Call 2020-01-29: Difference between revisions

From GO Wiki
Jump to navigation Jump to search
mNo edit summary
Line 12: Line 12:
* Travel funds: what funds are available?
* Travel funds: what funds are available?
** Proposed dates in the Feb 24-28; David will need to use the 24th as a travel day.
** Proposed dates in the Feb 24-28; David will need to use the 24th as a travel day.
**Rooms are no longer available at the Ath, so Sarah will look into booking rooms at the Pasadena Hilton.   
**Sarah has booked rooms at the Pasadena Hilton for David, Kimberly, Lori, and Seth.  Anyone else coming, please get travel dates ASAP; rooms were filling up.   
**Agenda
**Agenda
** Premeetings?
** Premeetings?

Revision as of 11:58, 29 January 2020

Agenda

  • Agenda: Kimberly (may be a bit late to call)
  • Minutes: Huaiyu
  • Present:

Discussion points

Upcoming Meetings

Caltech f2f

  • Pipeline hackathon at Caltech.
  • Travel funds: what funds are available?
    • Proposed dates in the Feb 24-28; David will need to use the 24th as a travel day.
    • Sarah has booked rooms at the Pasadena Hilton for David, Kimberly, Lori, and Seth. Anyone else coming, please get travel dates ASAP; rooms were filling up.
    • Agenda
    • Premeetings?

Subcontracts should pay, if possible, otherwise USC will cover the cost. Kimberly will check with Sarah and Paul S. about possibly using Caltech GO funds.


Other February meetings

  • Other meetings on the radar?

PI meeting; otherwise just the Caltech f2f

Does anyone know why the GO-Away calendar seems to have disappeared?

In short, no.

Status of Projects

Anything to report?

Getting ready for next steps in MOD import project - annotation history, file and dataflow, determining what steps are generalizable and what steps need to be configured for individual MODs

GO and the Alliance

Biological Function Working Group

  • Current status

Gene Descriptions Working Group

  • Draft manuscript sent to go-consortium
  • Discuss presentation of use of evidence codes
  • Future interactions?

Outreach: monthly seminars

Action from last week: Chris starting with Dexter and Peter Robinson to setup meetings

  1. We will do this when there is time.

Defer until Chris is back.

GO meeting

" Registration fees: waiting for USC feedback

Laurent-Philippe is working on finalizing the costs to set registration fees and finishing the registration form. Paul T. will look into getting some help with EventBrite. Laurent-Philippe will send out a 'save the date' email jso everyone is aware of the May dates; formal email about registration will come later.