Manager Call 2020-01-29: Difference between revisions
(Created page with "=Agenda= * Agenda: Kimberly (may be a bit late to call) * Minutes: Huaiyu * Present: =Discussion points= == Upcoming Meetings == === Caltech f2f === * Pipeline hackathon a...") |
|||
Line 9: | Line 9: | ||
== Upcoming Meetings == | == Upcoming Meetings == | ||
=== Caltech f2f === | === Caltech f2f === | ||
* Pipeline hackathon at Caltech. | * Pipeline hackathon at Caltech. | ||
* Travel funds: what funds are available? | * Travel funds: what funds are available? | ||
** Proposed dates in the Feb 24-28; David will need to use the 24th as a travel day. | ** Proposed dates in the Feb 24-28; David will need to use the 24th as a travel day. | ||
** | **Rooms are no longer available at the Ath, so Sarah will look into booking rooms at the Pasadena Hilton. | ||
**Agenda | |||
** Agenda | |||
** Premeetings? | ** Premeetings? | ||
Revision as of 16:11, 28 January 2020
Agenda
- Agenda: Kimberly (may be a bit late to call)
- Minutes: Huaiyu
- Present:
Discussion points
Upcoming Meetings
Caltech f2f
- Pipeline hackathon at Caltech.
- Travel funds: what funds are available?
- Proposed dates in the Feb 24-28; David will need to use the 24th as a travel day.
- Rooms are no longer available at the Ath, so Sarah will look into booking rooms at the Pasadena Hilton.
- Agenda
- Premeetings?
Subcontracts should pay, if possible, otherwise USC will cover the cost. Kimberly will check with Sarah and Paul S. about possibly using Caltech GO funds.
Other February meetings
- Other meetings on the radar?
PI meeting; otherwise just the Caltech f2f
Does anyone know why the GO-Away calendar seems to have disappeared?
In short, no.
Status of Projects
Anything to report?
Getting ready for next steps in MOD import project - annotation history, file and dataflow, determining what steps are generalizable and what steps need to be configured for individual MODs
Outreach: monthly seminars
Action from last week: Chris starting with Dexter and Peter Robinson to setup meetings
- We will do this when there is time.
Defer until Chris is back.
GO meeting
- Status (copied from last week): Draft is here.
" Registration fees: waiting for USC feedback
Laurent-Philippe is working on finalizing the costs to set registration fees and finishing the registration form. Paul T. will look into getting some help with EventBrite. Laurent-Philippe will send out a 'save the date' email jso everyone is aware of the May dates; formal email about registration will come later.