Ontology meeting 2019-10-28: Difference between revisions
Jump to navigation
Jump to search
(Created page with "= Conference Line = See calendar for details = Agenda = ==Discussion topics== * Instructions for merges: Pascale updated to mention that if a term you plan to merge has tax...") |
|||
Line 5: | Line 5: | ||
==Discussion topics== | ==Discussion topics== | ||
===Term merges and taxon constraints=== | |||
* Instructions for merges: Pascale updated to mention that if a term you plan to merge has taxon constraints, the taxon constraints must be edited and regenerated before doing the merge. See [[Merging_Ontology_Terms]]. | * Instructions for merges: Pascale updated to mention that if a term you plan to merge has taxon constraints, the taxon constraints must be edited and regenerated before doing the merge. See [[Merging_Ontology_Terms]]. | ||
Revision as of 19:57, 27 October 2019
Conference Line
See calendar for details
Agenda
Discussion topics
Term merges and taxon constraints
- Instructions for merges: Pascale updated to mention that if a term you plan to merge has taxon constraints, the taxon constraints must be edited and regenerated before doing the merge. See Merging_Ontology_Terms.
Pathways2GO
- We are going to have the meeting in NYC on December 3rd and 4th.
- Peter D is holding 5 rooms at the Washington Square Hotel for Monday, December 2nd and Tuesday, December 3rd.
- Attendees will need to pay for rooms themselves at checkout and then get reimbursed (subcontract, if possible; main GOC grant if not).
- If you need nights outside of those dates, please arrange independently.
Other Business
https://github.com/geneontology/go-ontology/projects/1