** AmiGO 2.1 in testing May (Seth, Rama) | ** AmiGO 2.1 in testing May (Seth, Rama) | ||
== Authentication / Auth == | === Authentication / Auth === | ||
* Gathering requirements at CalTech hackathon | * Gathering requirements at CalTech hackathon | ||
* Implementing persona integration in Noctua | * Implementing persona integration in Noctua | ||
* Authentication YAML for Noctua specified | * Authentication YAML for Noctua specified | ||
== Noctua == | === Noctua === | ||
* CalTech hackathon, discussed integration between Capella (text span annotation tool) and Noctua [https://github.com/kltm/go-mme/issues/51 noctua-51] | * CalTech hackathon, discussed integration between Capella (text span annotation tool) and Noctua [https://github.com/kltm/go-mme/issues/51 noctua-51] | ||
* Documentation of 3 components: Noctua, Barista and Minerva LINK TO DOCS | * Documentation of 3 components: Noctua, Barista and Minerva LINK TO DOCS | ||
* Implemented LEGO->GPAD in OWLTools [https://www.ebi.ac.uk/panda/jira/browse/GO-288 JIRA GO-288] | * Implemented LEGO->GPAD in OWLTools [https://www.ebi.ac.uk/panda/jira/browse/GO-288 JIRA GO-288] | ||
== Transition to OWL == | === Transition to OWL === | ||
Top-level ticket: [https://www.ebi.ac.uk/panda/jira/browse/GO-222 GO-222] | Top-level ticket: [https://www.ebi.ac.uk/panda/jira/browse/GO-222 GO-222] | ||
Line 28: | Line 28: | ||
* Fixes to obo/owl converter for never_in_taxon links | * Fixes to obo/owl converter for never_in_taxon links | ||
== GPAD/GPI == | === GPAD/GPI === | ||
* GPAD 1.1 spec (Tony, Heiko, Chris, DavidOS) | * GPAD 1.1 spec (Tony, Heiko, Chris, DavidOS) | ||
* Added 2-way converters to OWLTools (Heiko) | * Added 2-way converters to OWLTools (Heiko) | ||
* GPI exports direct from MGI (Mary) | * GPI exports direct from MGI (Mary) | ||
== Retire GO Mine == | === Retire GO Mine === | ||
* Done? (SETH/KALPANA) | * Done? (SETH/KALPANA) | ||
Revision as of 16:54, 5 June 2014
Progress Report Q2
Website
- Drupal
- Drupal Content: migration complete (Moni, Seth, Rama, ...)
- Drupal Rollout: migrated to amazon, still testing (Seth, Stuart) JIRA GO-106
- AmiGO
- AmiGO 2.0 released in March (Seth)
- AmiGO 2.1 in testing May (Seth, Rama)
Authentication / Auth
- Gathering requirements at CalTech hackathon
- Implementing persona integration in Noctua
- Authentication YAML for Noctua specified
Noctua
- CalTech hackathon, discussed integration between Capella (text span annotation tool) and Noctua noctua-51
- Documentation of 3 components: Noctua, Barista and Minerva LINK TO DOCS
- Implemented LEGO->GPAD in OWLTools JIRA GO-288
Transition to OWL
Top-level ticket: GO-222
- Berkeley OWL hackathon (with David and Tanya): gathered requirements, tested roundtripping, reasoning etc
- Added import catalogs to OE (this allowed us to add all logical defs to main ontology)
- oboeditor plugin for Protege v0.1 (Heiko, Simon J)
- Fixes to obo/owl converter for never_in_taxon links
GPAD/GPI
- GPAD 1.1 spec (Tony, Heiko, Chris, DavidOS)
- Added 2-way converters to OWLTools (Heiko)
- GPI exports direct from MGI (Mary)
Retire GO Mine
- Done? (SETH/KALPANA)
Priorities for Q3
WebSite
- Drupal and AmiGO 2 client running in cloud?
- AmiGO AmiGO_2#Timeline
- Selenium test framework (Mary)
- AmiGO 2.2 July
- AmiGO 2.3 Oct
Noctua
Top-level ticket: GO-255
- Working prototype of Capella-Noctua integration noctua-51
- SETH TO ADD
- import from Reactome (Chris)
Infrastructure
- Migrate MGI GAF->GPAD scripts to OWLTools (Mary)
- Refactor Golr loading (Seth, Heiko, Chris)
- Migrate crons to Jenkins JIRA GO-99
MySQL retirement
- Replace go-db-perl code with owltools code (Kalpana)
Transition to OWL
- oboeditor plugin v0.2
- prototype of solution for caching inferred links (Heiko, DavidOS)
- Progress towards automation of integration with RHEA GO-190 -- not enough resources to complete in Q3
- Progress towards automation of integration with IPR/PFAM -- not enough resources to complete in Q3