1 Jun 2021 PAINT Conference Call: Difference between revisions
Jump to navigation
Jump to search
Line 25: | Line 25: | ||
** Should rules and effects be consistent between curator actions in the tool vs the monthly validator runs? | ** Should rules and effects be consistent between curator actions in the tool vs the monthly validator runs? | ||
*** Ex: Curator is allowed to create an IBD in violation (with a warning) but validator doesn't allow this and will obsolete later. Maybe this is a nonsensical example? | *** Ex: Curator is allowed to create an IBD in violation (with a warning) but validator doesn't allow this and will obsolete later. Maybe this is a nonsensical example? | ||
* Taxon constraint violations in PAINT spreadsheet | |||
** https://docs.google.com/spreadsheets/d/1Z08fYN1GC7azI9354wtAnoYTprZ0mZvyOl-HjHzsTn0/edit#gid=0 | |||
[[Category:PAINT]] | [[Category:PAINT]] |
Revision as of 13:00, 1 June 2021
Present
Agenda
How will PAINT handle GP2term relations
- Need to define specs; proposal (Pascale) PAINT would load GP2term relations so PAINT curators would be able to select more precise annotations for propagation.
NOT annotation issues
https://github.com/geneontology/go-annotation/issues/3701
IBA Release notes
- Recording any drastic changes like increases or decreases
- Where would the release notes be available?
- Example URL: http://data.pantherdb.org/ftp/downloads/paint/current/README (doesn't exist yet)
- Or just roll into GO release notes? Ex: https://github.com/geneontology/go-site/tree/master/releases/2021-05-01
Taxon constraints in PAINT
- How they currently affect PAINT objects
- Experimental annotations - considered valid to use for IBD evidence if no TC violation
- IBDs - will be obsoleted if IBD itself violates a TC or if it loses all experimental evidence due to TC checks in step #1
- TCVs - created in the family trees from the TCs and used to block propagation of IBAs
- Tool logic vs validator (batch process) logic?
- Should rules and effects be consistent between curator actions in the tool vs the monthly validator runs?
- Ex: Curator is allowed to create an IBD in violation (with a warning) but validator doesn't allow this and will obsolete later. Maybe this is a nonsensical example?
- Should rules and effects be consistent between curator actions in the tool vs the monthly validator runs?
- Taxon constraint violations in PAINT spreadsheet