Manager Call 2017-10-18: Difference between revisions

From GO Wiki
Jump to navigation Jump to search
 
(20 intermediate revisions by 3 users not shown)
Line 1: Line 1:
= Agenda =
= Agenda =
== GOC meeting action item review ==
== GOC meeting action item review ==
https://docs.google.com/document/d/1Y9_Mvqes3op36TPHgfaS7K5FHnGZLgUApghIFYyUKR8/edit#
== GOC mailing lists clean up ==
== GOC mailing lists clean up ==
* Remove/merge some lists
* Remove/merge some lists
* Remove some people for eg from Managers list ?
* Remove some people for eg from Managers list ?
== Proposed Re-Organization of Noctua Documentation ==
== Proposed Re-Organization of Noctua Documentation ==
*Proposed re-organization of [http://noctua.berkeleybop.org/ Noctua 'landing' page]
*Proposed re-organization of [http://noctua.berkeleybop.org/ Noctua 'landing' page] below
*Documentation would be text, screenshots, and videos wherever possible
*See [https://docs.google.com/document/d/1hmYNEP7lWFwWGJbDOHfsfDvT77yBNRH4IW1TAPyhdqg/edit Outline on Google docs]
**Welcome to Noctua
*The old [http://wiki.geneontology.org/index.php/LEGO_Specification_Proposal LEGO specification proposal]
***Brief 1-2 sentences on GO-CAM and Noctua (what it is)
*Documentation would be text, screenshots, and videos  
**Getting Started: The Basics
**Note that existing videos hosted on Vimeo are all out-of-date wrt the UI and will need to be re-done
***GO-CAM Philosophy
*Goal is to have concise, up-to-date, production-quality instructions
****Causal Activity Modeling
*Source for current documentation on Noctua lives here:  https://github.com/geneontology/noctua
****Annotons
**Can we organize all user documentation into a single folder on github?
***Using Noctua
*Good news: we can/will re-use existing documentation wherever possible
****Getting a Noctua Account
 
*****GitHub
= Minutes =
*****users.yaml
*On call: Pascale, Kimberley, Chris, Huaiyu, Paul D., Judy, Suzi, David H.
****Creating Basic GO Annotations in Noctua
 
*****Graphical Editor
==Review action item. (Pascale)==
*****Table Editor
 
****Browsing and Searching Existing Models
===Implementation of new qualifier “causally upstream of or within”, with the more specific children “causally upstream of” and “involved in”===
*****Noctua
*Pascale: A ticket was added. Propose to implement by April next year (next GO meeting). This is for the legacy annotations.  
*****AmiGO
*David: Probably should be done sooner
****Incorporating Annotations into Your Database
*Chris: Add a title of the ticket.
*****GPAD Annotation Preview
*David: What is the resource?
*****Downloading Annotation Files from Jenkins
*Chris: New GAF version
****GitHub trackers
*Priority?
***Advanced Modeling
*Chris: High. Seth and Eric will work on it.
****Creating Causal Models of Biological Processes
*Judy: Needs more transparency. Make sure it is done on time.
*****Relations between Functions
 
*****Relations between Functions and Processes
===Regulation term===
****Reasoning and Annotation Inferences
 
***FAQs
===Multiple qualifier===
***Feedback
come up with proposal before the next GO meeting.
***Technical Documentation
 
****For Developers
===CC qualifier and colocalize with===
*****Noctua development documentation
These are two different action items. Can be grouped together.
*****Noctua models repository
 
***In Progress
===Protein complex===
****Embeddable widgets
 
****Model display options
Come up with a proposal before the next GO meeting
****Network-based enrichment analysis
 
 
===Noctua===
*Data flow - Work with the users.
*The priority is to push Noctua to the production level. Huaiyu suggested to use this project for a project management exercise. Pascale will work with Chris to set up deadlines for all requirements. Chris pointed out that there was no real requirement documents. Everything is in github tickets. There are two types of tickets: bugs and new features.
*End-user tool (visualization)


== Minutes ==
*On call:


To be finished at the next manager call.


The other two items on the agenda were not discussed, and will be postponed to the next call.




[[Category: GO Managers Meetings]]
[[Category: GO Managers Meetings]]

Latest revision as of 19:29, 19 October 2017

Agenda

GOC meeting action item review

https://docs.google.com/document/d/1Y9_Mvqes3op36TPHgfaS7K5FHnGZLgUApghIFYyUKR8/edit#

GOC mailing lists clean up

  • Remove/merge some lists
  • Remove some people for eg from Managers list ?

Proposed Re-Organization of Noctua Documentation

  • Proposed re-organization of Noctua 'landing' page below
  • See Outline on Google docs
  • The old LEGO specification proposal
  • Documentation would be text, screenshots, and videos
    • Note that existing videos hosted on Vimeo are all out-of-date wrt the UI and will need to be re-done
  • Goal is to have concise, up-to-date, production-quality instructions
  • Source for current documentation on Noctua lives here: https://github.com/geneontology/noctua
    • Can we organize all user documentation into a single folder on github?
  • Good news: we can/will re-use existing documentation wherever possible

Minutes

  • On call: Pascale, Kimberley, Chris, Huaiyu, Paul D., Judy, Suzi, David H.

Review action item. (Pascale)

Implementation of new qualifier “causally upstream of or within”, with the more specific children “causally upstream of” and “involved in”

  • Pascale: A ticket was added. Propose to implement by April next year (next GO meeting). This is for the legacy annotations.
  • David: Probably should be done sooner
  • Chris: Add a title of the ticket.
  • David: What is the resource?
  • Chris: New GAF version
  • Priority?
  • Chris: High. Seth and Eric will work on it.
  • Judy: Needs more transparency. Make sure it is done on time.

Regulation term

Multiple qualifier

come up with proposal before the next GO meeting.

CC qualifier and colocalize with

These are two different action items. Can be grouped together.

Protein complex

Come up with a proposal before the next GO meeting


Noctua

  • Data flow - Work with the users.
  • The priority is to push Noctua to the production level. Huaiyu suggested to use this project for a project management exercise. Pascale will work with Chris to set up deadlines for all requirements. Chris pointed out that there was no real requirement documents. Everything is in github tickets. There are two types of tickets: bugs and new features.
  • End-user tool (visualization)


To be finished at the next manager call.

The other two items on the agenda were not discussed, and will be postponed to the next call.