Manager Call 2018-11-21: Difference between revisions

From GO Wiki
Jump to navigation Jump to search
Line 8: Line 8:
** Why was it delayed? Do we need more resources on releases ?  
** Why was it delayed? Do we need more resources on releases ?  
* '''GO website migration''': Suzi L/Laurent-Philippe: Aim: Dec 1 -> Are there any delays?  
* '''GO website migration''': Suzi L/Laurent-Philippe: Aim: Dec 1 -> Are there any delays?  
** Requires many technical tasks that mostly require Seth
* '''Data release pipeline''': Pascale/Seth: Are there any blocking issues remaining? If not, we can de-
* '''Data release pipeline''': Pascale/Seth: Are there any blocking issues remaining? If not, we can de-prioritize this for now
** Many steps are inefficient and slow
** More work needs to be done: Most work is done by Eric right now - can anyone else help on that ? Paul can find more resources - what do we need ?
** In the longer term: We need a person who will be responsible for the pipeline - possibly 25% (long-term estimate)
* '''Noctua+GO-CAM repository''': Kimberly/Seth/David:  
* '''Noctua+GO-CAM repository''': Kimberly/Seth/David:  
** A developer is needed full time to develop until the Cambridge meeting:
** Status update
** Tasks: (just a teaser): 
*** getting in all existing annotations in - including implementing gp2term relations implemented
**** Chris: We will not be able to bring in everyone's annotations in by Cambridge
**** Back end: how much work will that be? Issues, we need to figure out how to partition annotations. We have some research work about this, there are many possible ways. We need to decide on the strategy.
**** Paul: is there a solution where nothing is connected at first (ie, 1 model for every annotation)? This would avoid create dependencies on connections AT FIRST. Advantage is that every group could move to Noctua as soon as that's in place. Otherwise we will likely be delayed.
**** David: we need to have a plan for how models/individual annotations will be handled/re-merged
**** Kimberly: AI we should make a Google doc - TO DISCUSS at the next managers call (?)
**** Pascale: we also need to think about doing QC on the automatic tools that would predict connectivity - that will take quite some time too, so prefers a more simple solution
**** Chris suggests doing an experiment in which we test integrating unconnected annotations, for example starting with dictyBase
**** Proposed import process: take triples out of each model
*** improve RO – who should do that? Including testing property chains:
**** Chris: We can have a bit of Jim's time on this.
**** David: What will we do about the different 'participants' relations - are we just moving forward ? Chris: yes
*** work on reasoning
*** fixing issues with pipeline (including GPAD output)
**** required GPAD2, which will require some plumbing and will break for a lot of people: people importing GPAD 
**[https://docs.google.com/document/d/1FSWy7mvsSN7yZ10TL5CzSeJrzverub_oYwHY25bKD9o/edit Noctua Roadmap]
* '''GO rules (includes QC)''': Pascale/Eric: Improving reports: end of 2018, implement/fix some rules 4 rules /month?
* '''Tools''':
** GO API implementation (Laurent-Philippe / Deepak)
** Bioinformatics Guide (how to):
*** Ontology manipulation / traversal (parents, children, slim, related terms, etc)
*** Search / Browse / Aggregate annotations (e.g. per gene, taxon, pathway, aspect, etc)
*** Interactive Online Notebooks:
**** Jupyter (Python)
**** R Markdown (R)


Projects:  
Projects:  

Revision as of 12:47, 19 November 2018

Agenda

Follow up on priorities

  • Release: came out on Nov 16:
    • Suzi, will you announce ? Do we have a process?
    • Why was it delayed? Do we need more resources on releases ?
  • GO website migration: Suzi L/Laurent-Philippe: Aim: Dec 1 -> Are there any delays?
  • Data release pipeline: Pascale/Seth: Are there any blocking issues remaining? If not, we can de-
  • Noctua+GO-CAM repository: Kimberly/Seth/David:
    • Status update

Projects:

  • Data release pipeline: Pascale/Seth
  • GO rules (includes QC): Pascale/Eric
  • GO website migration: Suzi L/Laurent-Philippe
  • Noctua: Kimberly/Seth
  • GO-CAM integration with other pathway resources: Paul/Ben/David
  • QC: ->
  • Annotation & ontology: no specific project

External

  • CHEBI
  • Complete proteomes
  • Contributing groups

Next hackathon

Early February in LA?

Proposed aims (David, Kimberly, Pascale):

  • import of legacy annotations & GP2term relations
    • also for importing legacy annotations - mapping existing annotation extensions to GO-CAM models

Action items

https://docs.google.com/document/d/13BIc-zYaxIkIfK21Jhfk74pNq2jvtjepFdSGd6twpdw/edit#